Technology Operation

Technology details

Technology Operation Technology Details
Technology Name/Model Entech Waste-to-Gas
Technology currently in operation (location, country) Technology currently in operation (location, country)

Wastes processed by technology

Waste types that are processed by technology. (level of contamination or restrictions minimum amount processed, etc.)

Wastes processed by technology Waste types processed by technology. (level of contamination or restrictions minimum amount processed, etc.)
Asbestos No
E-waste (computers, mobile phones, TVs & monitors) No
End-of-Life vehicles No
Aluminum No
Glass beverage containers No
Used cooking oil Yes
Persistent organic pollutants Yes
Plastic Containers (PP) Yes
Plastic Containers (HDPE) Yes
Plastic Containers (PET) Yes
Plastic Containers (PVC) Yes (max 5%)
Plastic Containers (other) Yes
Other plastics (provide details) All residual plastics can be thermally treated
Expired pharmaceutical wastes Yes
Mercury and compounds Yes
Solvents and paints Yes
Paper and cardboard Yes
Healthcare Waste Yes
E-Waste (whitegoods & general electrical products) No
Scrap steel (ferrous metals) Yes-recovered in ash
Copper Yes-recovered in ash
Used motor oil Yes
Pesticides Yes
Laboratory grade chemicals Yes
Used Lead-acid batteries No
Expired industrial chemicals Yes
Used tires Yes
Organic matter (garden waste) Yes
Organic matter (food waste – households/ markets) Yes
Other Other

Outputs

Recoverable and unrecoverable products, Average ratio, the average quantity of power output (kW/kg) and Environmental emissions.

Outputs Details
What are recoverable products (What does the technology make or do)? Energy in form of heat, steam, electricity. Bottom ash, metals
What are unrecoverable waste products (waste material after processing)? Air quality control residual
Average ratio – input v recoverable (%) 95-98% by weight
If producing power, average quantity of power output (kW/kg) 0.5 to 0.75 (depends of heating value of waste)
Environmental emissions (emissions to air or discharges to water or soil) Air emissions meet latest EU IED standards. No discharge to water or soil
Other comments on outputs? Other comments on outputs?

Inputs

Waste input - Min/Max, Input power requirements, and required consumable products or parts.

Inputs Details
Waste input - Minimum Kg/day 1000
Waste input - Maximum Kg/day 600,000
Input power requirements? 3 Phase Power
Input power consumption (Maximum waste input kW and specify conditions if required) Parasitic load is around 10% of gross power
Input power consumption (Minimum waste input kW and specify conditions if required) Parasitic load is around 10% of gross power
Additional inputs? (list all) (e.g. water, heat, diesel, reagents/ chemicals) What are required consumable products or parts? (list all) (e.g. blades, belts thermocouples, software, licenses) How often do consumable products or parts need replacing (# / operating hour) Who stocks spare parts? Water for boiler Gas/ diesel for start up Reagents - Lime & Activate carbon
What are required consumable products or parts? (list all) (e.g. blades, belts thermocouples, software, licenses) thermocouple, electrical switches, relay, circuit breaker, signal transmitter, pressure transmitter, pressure gauges, position switches, PLC, inverter, kw<10 motor, kW<10 fan belt, fan pressure switch, fan damper, damper actuator, hydraulic oil valves, wire rope-rams, water solenoid valves, isolating valves, bearings, chain links-cart tipper, load cells-weight station, burner gas train & controller, burner ignition & flame sensor, hydraulic cylinder, air cylinder.
How often do consumable products or parts need replacing (# / operating hour) Various suppliers in Asia, locally and Australia
Who stocks spare parts? Who stocks spare parts?

Operating requirements

Size/Dimensions of technology/equipment and detail design or operating limitations.

Operating requirements Details
Size/Dimensions of technology/equipment (Length, Width, Height in Meters and Weight in Kg) Will be determined by project For example, a 3.5MWt project can process 1 tonne per hour and typically requires 24m wide x 15m long x 15m high
Detail design or operating limitations (e.g., range of humidity, temperature, minimum daily/weekly operation) Can be designed to operate in all temperature and humidity. Minimum to be commercial is typically 8 hours 5 days a week but there is flexibility on operation limits
Other comments on operating requirements? Other comments on operating requirements?

Staff requirements and training

How many staff are required to operate the technology and what skill level required?

Staff requirements and training How many staff are required to operate the technology and what skill level required?
How many staff are required to operate the technology? 3 per shift
What skill level is required to operate the technology? Low (on-job training - i.e warden)
Is training or other support provided for: Commissioning, Operations, Decommissioning, Maintenance
Could you please elaborate by what means Is training or other support provided? (e.g., technical support, onsite training, an online package, or training manual) Staff training included in commissioning period
What general maintenance is required and to what skill level? Monthly shutdown for 2 - 3 days Boiler technician Electrical engineer Entech engineer Mechanical technicians
Other comments on staff requirements and training? Other comments on staff requirements and training?

Standards and Permits

Operating permits/ licenses and does the technology comply with any local and/or International Standards?

Standards and Permits Details
What kinds of operating permits/ licenses have typically been required? (e.g., licenses specifying air emission limits, discharge limits, noise limits etc.) Local Environmental permits for air emissions
Does the technology comply with any local and/or International Standards? (e.g., Australian, European, North American etc.) Does the technology comply with any local and/or International Standards? (e.g., Australian, European, North American etc.)

Costs and Warrantee

Capital cost, Minimum/Maximum size/input, installation and commissioning cost, and warranty period for the technology?

Costs and Warrantee Details
Capital cost (USD ex-factory - excluding taxes and transport) Entech plants are bespoke design and can only be determined by understanding waste type, throughput, power off-take requirements etc.
Minimum size/input (Please state in US Dollars). Also state any specify conditions if required. Entech plants are bespoke design and can only be determined by understanding waste type, throughput, power off-take requirements etc.
Maximum size/input (Please state in US Dollars). Also state any specify conditions if required. Entech plants are bespoke design and can only be determined by understanding waste type, throughput, power off-take requirements etc.
Typical installation and commissioning cost (Please state in US Dollars). Also state any specify conditions if required. Entech plants are bespoke design and can only be determined by understanding waste type, throughput, power off-take requirements etc.
What is the warranty period for the technology? Please also specify conditions if required (e.g., specific operating conditions). What is the warranty period for the technology? Please also specify conditions if required (e.g., specific operating conditions).